Sunday, 15 June 2014

Airconditioning & Electrical Cutouts, Bits and Pieces

This week we had the wet area tiles grouting completed. The niches don't look so terrible now that there's white grout to make the lines less severe.

We had electrical points all cut out of the gyprock this week ready for fit offs this week. 

We got a call from the air conditioning company and were able to change our vents to the square ones, which we are so thankful for because we chose the round ones in the beginning but were having second thoughts about them since. 

We had little touch ups for gyprock including having the staircase and understairs storage gyprocked up, plus other parts around the house that weren't fully sealed by the initial gyprock install. 

This week we should finally be getting first coats of paint around the house. We are booked in for floor tiling to commence from the 19th (Thursday). 

Enjoy the pics

Cx



















Friday, 2 May 2014

Electrical Rough-in

Hi everyone,

Sorry I haven't updated in a while...there just hasn't been much to update.

However, I think we're on the move again this week. But still, we are behind on what and when we've been told things are happening.

Since my last post, this is how far we've gotten:

  • Air conditioning ducting
  • Electrical rough-in
  • Speaker pre-wiring
  • Noggins for my spray painted areas (woohoo!)
  • Half lower floor roof tiling completed (alfresco/leisure out back)
  • Fireplace and flue installed
  • Cavity units for sliding doors installed (theatre and ensuite)
  • Gyprock delivered onto site

Our SS called us today to tell us that our lower roof tiles would be finished today, but alas they have not.

Schedule: roof to be completed, gyprock to begin Monday for 10 days, doors/cornices to be installed, staircase install, then lockup

I think that will take us at least to the end of the month. It's really starting to drag on now.

I hope everyone else is getting things moving along on their sites!!!

Cx

Noggins put in above the fireplace

Cavity unit for ensuite

Lower roof tiling finally starting, silver thing is for the fireplace

Electrical rough-in, two speaker points; and air con ducting

Gyprock delivery

Looks like cornices?

Theatre room wiring

Theatre room podium provisions for step lights

Powerpoints, data and phone points for office

Scary ducting action in the roof

More ducting at back of house, duct on right is in the WIR

Gyprock delivery in our bedroom

The fireplace!

Speaker cabling in alfresco

Electrical rough-in for kitchen, and duct put in for range hood

FC sheeting put in finally sealing up the house walls

Closeup of the fireplace - so tempted to rip off the cardboard to have a looksie!

Tuesday, 20 August 2013

Progress!

It has been quite an eventful past couple of days for us! Everyone has got their variation estimates back to us for signing already, even when they estimated it would take a week. Love it, love it, love it!

Wisdom Internal/External Colours
Draft Colour Selection Sheet has been updated to include the variations we signed off last Friday

Carpet/Tiles/Flooring
Quote has come back for us to sign off on - we are going to visit one more time this weekend because I'm having second thoughts about the external tiles we have chosen (much to Pauly's dismay poor thing!)

Kitchen
This has come back already, our appointment was only last Friday!
We have now signed off on kitchen, and decided to leave the cupboards on one side of the oven, and to upgrade to flat stone drainage for the sink.
Now that we've signed off, they will start the kitchen drawings.

Electrical and Air Conditioning
Already signed off last week

Home Theatre
We contacted the Home Theatre rep that does Wisdom's installs, he was really nice and we've sent him a big email with our requirements and what we want estimated.
He said he would do a quote on supply & install, but also a quote on just install, which is great!


Today I had a call from our Wisdom rep who let me know that our plans have come back, and they should receive our BASIX assessment today and tomorrow she will be submitting to our Developer for approval!

EXCITED! What a huge moment!

Cx


Sunday, 18 August 2013

Appointments Completed

It has been quite an exhausting but productive week for us both! We completed our main appointments already, which is great and means no more thinking about colours and upgrades after this. We took 2 days off work to get these done ASAP:
  • Electrical (Clipspec, North Ryde)
  • Flooring (Di Lorenzo, Bella Vista)
  • Kitchen (Timpelle Kitchens, Prestons)
  • Air Conditioning (Ultra Air, Minchinbury)
I think we may still need to do a staircase appointment, but the only thing I need to confirm is the colour of the woodwork, as we won't be changing the design from the standard.

We have already received quotes to sign off from Di Lorenzo, Electrical and Air Conditioning we signed off on the day and we will get the Kitchen upgrades quoted up within 5 days. We also got our colours and quotes back from Wisdom this week, and we need to sign off on the extra upgrades from there.

This is the run down of the week!

Wisdom Colours
  • Final price for our Brick Upgrade to Boral Escura Velour Pearl Grey (main) and Boral Escura Velour Brown to front portico piers - came back a lot less than the original estimate which was great!!
  • Final price for second paint colour (for woodwork i.e. doors, architraves, etc)
  • Final price for clear timber stain to balcony door
  • Final price for privacy adapters to 5 internal doors
  • Final price for powder coat to balcony rail - we decided to not take this, and stick with "Surfmist" as our balcony railing colour to go with the windows
Electrical

The electrical appointment was interesting, I thought I was decently prepared for it, as we had drawn our ideal plan about a dozen times, but there were still things that we started thinking about on the day. Also choosing between builder's range items and Clipsal items was a bit more challenging than we thought! We signed the plan off on the day, but I wish I had more time to ponder and make changes now.

We were a little frustrated because we had been waiting to get the cost to pre-wire the theatre, and we were told we had to go back to Wisdom! Also, the same deal with pre-wire for the intercom!

These are some of things I can remember that we added in addition
  • Provisioned for downlights in main living areas
  • Up/Down exterior lights to front facade x4
  • 3 data points - office/theatre/leisure (easier to run data points to upstairs later if we wanted to)
  • Extra set double powerpoints to each room
  • Square LED staircase lights (we went with Clipsal over the builders range as they were halogen) - theatre room x2 (for podium step) and main staircase x4
  • We upgraded our light switches to the 'Impress' push button range with blue LED
  • Extra outdoor light on blindside/laundry side of house
  • Double motion sensor external light for the backyard
Flooring

This was a really difficult appointment! We had made about half a dozen trips here and had our list of tiles and were ready to go, but there's so much more involved in flooring than just selecting the tiles you want! It's particularly hard to visualise what they are explaining as well, we were a little exhausted toward the end! 

A lot more here to upgrade than we realised we would need to be doing. The people at Di Lorenzo really go through with detail exactly what you are getting in each and every room, and were very helpful!
  • Upgraded Laundry tile
  • Upgraded the shower wall with niche to all feature tiles (I am in love love love with this tile!)
  • Tiled to ceiling all of shower and bath recess only
  • Upgraded ensuite shower wall with niche to all feature tiles
  • Tiled ensuite shower to ceiling all of shower recess only
  • Upgraded powder room feature wall to all feature tiles
  • Upgraded floor wastes (except laundry) to the feature tile chrome wastes
We got quotes for the following and are still deciding whether we proceed with them or not (they ended up costing a little more than what we had expected/hoped for)
  • Extended tiling to underneath the staircase
  • Tiling to alfresco
Kitchen

Kitchen appointment at Timpelle was great, our customer service rep explained in detail and with drawings exactly what we were getting and recommended changes. A couple of things again we had been waiting for our kitchen appointment, only to be told we had to go back to Wisdom to get quotes on: Veg Spray tapware and space provisioning for a wine fridge in the pantry.

We are awaiting quotes on the following upgrades:
  • Second set of pot drawers to match opposite side of oven
  • Microwave provision with cupboards in kitchen niche
  • Set of pigeon door cupboards for VOID space underneath waterfall
  • Laminate pantry doors to match
  • Add set of drawers to main bathroom (instead of just pigeon doors)
Air Conditioning

This appointment the guy at Ultra Air ran us through his product, what we were getting, and how it works. We are staying with a two zone (Upper and Lower floors) and one command point. The upgrades are basically adding extra zones, and upgrading to the horizontal grills, which we didn't do either. Also he said we had the option to add zones later anyway, it's just a little more difficult but it can be done.



Pretty exciting I think, to finally have these all completed now.
The only things I'm worried about are the Theatre pre-wire, and the Intercom pre-wire which we have to get quoted back from Wisdom.

We also have not yet submitted our plans to the Developer for approval, as changes to our drawings had to be made because of our landscaping decisions e.g. remove laundry steps, change driveway shape (5 days). 

Plan for the week:
We are hoping to hear back from Wisdom some time this week and have them submit to the Developer.

Cx