Sunday 20 July 2014

Kitchen Fixed and Driveway Poured

Feeling a lot better after this week. Again, really happy with our new site supervisor Phil!

We are loving the driveway it looks really nice, and are really happy that everything is finally coming together. This has probably been the first time we actually feel like this whole process is coming to an end.

The following has been done this week:

  • Kitchen fixed
  • Theatre outlet for projector installed
  • Fireplace completed
  • Driveway poured
  • Waterproof redone for main shower leak
  • Gas connected
  • Spa motor installed and connected


Phil has let us know that currently the plan for the following week is this:

  • Monday/Tuesday - tiles being fixed in main area and main bathroom; final brick clean
  • Tuesday/Wednesday - carpets being installed; sealant to all wet areas
  • Thursday - final painting touchups
  • Friday - final house clean

We currently have a tentative PCI date booked in for Tuesday 29th which he said he will confirm with us on Monday morning - fingers crossed.

Cx


Fireplace fascia installed

Tiles in the kitchen to be relaid

Driveway/footpath before the pour

Spa motor installed (access through our wardrobe)



2 comments:

  1. Hi!!
    Good luck with PCI tomorrow :)
    one more time I have to say I love your fireplace, looks so nice. Also the 40mm bench top looks great.

    Are you working on the landscaping or WH?

    cheers

    ReplyDelete
  2. Hi VP, thanks for that. I would say it was a success because we are getting a lot of things fixed up :) Thanks I love the fireplace too - I'm dying to switch it on!
    WH is doing driveway, temp wood steps for our laundry and the forsaken letterbox. After everything we've been through with them, plus their exorbitant pricing, that's all we are asking them to do. We are getting quotes from other landscapers that have come back at half the price of what WH quoted us for the same works.
    Good luck with your slab can't wait to see it!

    ReplyDelete