The good:
Our SS has been great following up on things. This week saw:
- door furniture installed
- kitchen splashback installed
- shelving installed
- mirrored robe doors switched over
- ensuite shower door installed
- towel rails and toilet roll holders installed
- diamond grill sliding door to alfresco installed
- garage door [finally] installed yay!
- scaffolding removed
- termite reticulation installed
The bad [and the ugly]:
Crooked Kitchen
So...during the week I was looking down at the tiles behind the kitchen island. I proceeded to notice that the tiles weren't even/uniform...and soon realised that this was because my kitchen island has been installed on an angle! My kitchen is crooked. I took a laser measure and made sure the next day, and it is out by 25mm - an inch!
We told our SS and he had the kitchen installer come out on Friday to take a look. Apparently he was sick to his stomach when he saw it and they will be ripping up tiles and fixing it up next week.
Although I'm not happy this happened, I'm glad our SS sorted it out straight away and that Timpelle Kitchens are sorting it out ASAP. I don't think our last SS would even have called the kitchen people to have a look!
This is setting us back another week now with the kitchen taking 3 days to fix and the rest of the week to redo the tiling. So no PCI this week.
Gas Connection Delay
Supposedly we are having the driveway formed and poured next week, however our SS says that AGL have asked for 2 wk lead time for a new connection. So that means we can't have the driveway poured until the gas is connected, and it also means we won't be able to have PCI until the gas is connected.
Leaks
Apparently there's a leak from the ensuite shower that the waterproofer is looking at this week.
We also noticed that under the kitchen sink water has pooled in the cupboard which is started to warp the bottom shelf. Hopefully they've seen this and fix it. I'm also hoping they change that cupboard now...
Missing Powerpoint in theatre
We are supposed to have a ceiling mounted powerpoint in the theatre for a projector and I realised they installed an air con vent where I had marked it to be. Our SS asked our electrician about it who said that it wasn't on our electrical plan. We've resent our clipsal plan where it is shown so they'll have to fix that.
Plan for the week:
- waterproofing
- kitchen fix
- re-tiling
- driveway outline
Cx
Garage door installed - timbertone |
Splashback installed |
Splashback and caesarstone over sill to meet window |
Kitchen leakage under sink |
Cloak Room shelf and rail installed |
Storeroom shelving |
Pantry shelving installed |
Pantry shelving perfectly level |
Alfresco flyscreen doors installed |
Linen wire shelving installed |
Shower door installed, towel rail to be moved onto wall |
Mirror smart robe doors moved to each end of WIR |
The WIR behind feature wall - three sets of two doors... |
Robe shelving installed in main |
Termite reticulation system installed |
No comments:
Post a Comment